Fully Disbursed Loans/Credits Received (Non-Govt. Loans) Ongoing IBRD by India (Upto 31.03.2014) | ||||||
(Thousand US Dollars) | ||||||
Loan | Loan Amt. Availed Upto 31.03.2014 | Principal Repaid | Closing Debt Outstanding As on 31.03.2014 | Payment of Interest and other Charges | ||
During 2013- 2014 | Upto 31.03.2014 | During 2012- 2013 | Upto 31.03.2014 | |||
1992-1997-Eight Five Year Plan | ||||||
3577-IN PGCL Powergrid System Development Dt. (23.03.1993) | ||||||
3630-IN PFC Technical Assistance Project Dt. (07.07.1993) | ||||||
3632-IN NTPC Power Generation Project Dt. (09.12.1993) | ||||||
3992-IN ILandFS Orivate Infrastructure Finance Proj. Dt. (10.07.1996) | ||||||
Plan Year Total | ||||||
1997-2002-Ninth Five Year Plan | ||||||
4226-IN Coal Sector Rehabilitation Dt. (19.03.1998) | ||||||
4571-IN IREDA Second Renewable Energy Project Dt. (11.08.2000) | ||||||
4603-IN Second Powergrid System Dev. Project Dt. (13.06.2001) | ||||||
Plan Year Total | ||||||
2002-2007-Tenth Five Year Plan | ||||||
4813-IN Power System Development Project-III Dt. (02.05.2006) | ||||||
7263-IN Small and Medium Ent. Financing and Dev. Project, SIDBI Dt. (14.01.2005) | ||||||
Plan Year Total | ||||||
Grand Total |