Energy Plant Load Factor in Arunachal Pradesh (2020-2021-upto September 2020) | |||||
Sector/Stations | Monitored Capacity (In MW) | Generation Target (2020-2021) (In GWh) | Plant Load Factor (In %age) | ||
Program | Actual | Actual Same Period (2019-2020) | |||
Central Sector | |||||
Kameng HPS | |||||
Pare | |||||
Ranganadi HPS | |||||
NEEPCO Hydro | |||||
Central Hydro | |||||
Total Hydro | |||||
Arunachal Pradesh | |||||
India |