Station-wise Installed capacity (Thermal/Hydel/Wind/Gas) by Transmission Corporation of Andhra Pradesh (30.04.2003) | |
Station | MW |
Thermal | |
Kothagudem-A (KTPS-A) | |
Kothagudem-B (KTPS-B) | |
Kothagudem-C (KTPS-C) | |
Kothagudem-D (KTPS-D(V Stage)) | |
Ramagundam-B (RTS-B) | |
Nellore (NTS) | |
Vijayawada (VTPS-I,II&III) | |
RTPP | |
Total Thermal | |
Hydel | |
Machkund(AP) | |
TB Dam(AP) | |
Nizamsagar | |
Upper Sileru - I & II | |
Donkarayi | |
Lower Sileru | |
Srisailam Right Bank PH | |
Srisailam LBPH | |
NagarjunSagar RCPH | |
Nagarjunasagar Main PH | |
NagarjunSagar LCPH | |
Pochampad | |
Penna Ahobilam | |
Singur | |
Mini Hydel | |
State Sector | |
Private Sector | |
Total Hydro | |
Wind | |
State Sector | |
Private Sector | |
Total Wind | |
Gas | |
Vijjeswaram (VGTS - I& II) | |
Jegurupadu | |
Kakinada (Spectrum) | |
Kondapalli Power Corporation | |
Isolated Gas wells | |
BSES Ltd. | |
Total Gas | |
Others | |
Bagasse based co-gen | |
Bio-mass based power projects | |
Bio-mass based co-gen | |
Waste heat recovery co-gen (RCL) | |
Mini Power Plants | |
Total | |
Share from Central Sector | |
RSTPS (NTPC Ramagundam) (installed capacity : 2100 MW) | |
MAPP (installed capacity : 470 MW) | |
Neyveli (NLC 2MC-I & II) (installed capacity : 660 MW) | |
Kaigha APP | |
Simhadri TPS (NTPC) | |
NTPC-Talcher-2 share | |
Total Share from Central Projects | |
Grand Total |