Extent of Cost Overrun in Projects with Respect to Original Schedule in Andhra Pradesh (As on 01.02.2012) | ||||||||
State | No. of Projects | Total Cost (Rs. in Crore) | No. of Projects | Projects with Cost Overrun | ||||
Original Cost | Anti-cipated Cost | Cost Overrun (%) | Original Cost | Anti-cipated Cost | % INCR Base | |||
Andhra Pradesh | ||||||||
India |