Status of Ongoing Various Irrigation Projects (Major/Medium/ERM) in Andhra Pradesh - Part I (2007-2012 and 2012-2017) | |||||||||||
(Rs. in Crore; Area in ` 000 Hectare; Storage in Million Cubic Meter) | |||||||||||
Projects | Type of Project | Districts Beneffited | River Basin | River | Approval Status | Original Cost | Latest Estimated Cost | Start Year | Expenditure Upto XI Plan | Liability in XII Plan | Cost Considered For XII lan Formulation |
Anantha Venkata Reddy HNSS Project | |||||||||||
BRR Vamsadhara Project Phase I of Stage II (Final) | |||||||||||
BRR Vamsadhara Project Phase II of Stage II (Fanal) | |||||||||||
C.B.R.Right Canal Scheme | |||||||||||
Chintalapudi Lift Irrigation Scheme | |||||||||||
Gandikota CBR Lift Irrigation Schemes | |||||||||||
Gandikota Lift Irrigation Scheme (Included in GNSS Project) | |||||||||||
Indira Sagar Polavaram Project | |||||||||||
K.L.Rao Sagar Pulichintala Project | |||||||||||
Modernisation of Tungabhadra Project Low Level Canal | |||||||||||
NTR Telugu Ganga Project (Final) | |||||||||||
Offshore Servoir Scheme on Mahendratanaya River | |||||||||||
Poola Subbaiah Veligonda Project | |||||||||||
Pulikanuma Lift Irrigation Scheme | |||||||||||
Pulikanuma Lift Irrigation Scheme | |||||||||||
Raising and Idening of Flood Banks to 1986 Standards Along with Repairs to Structures, Construction of New Structures, Formation of Amps and Groynesin Respect of Eaches | |||||||||||
Somasila Rnamukhi Link Canal | |||||||||||
Sri Krishna Devaraya Galeru Nagari Sujala Sravanthi | |||||||||||
Sri Pothula Chenchaiah Paleru Reservoir Project (Final) | |||||||||||
Srisailam Right Bank Canal | |||||||||||
Tadipudi Lift Irrigation Scheme | |||||||||||
Tarakarama Thirtha Sagaram Reservoir Project | |||||||||||
Venkatanagaram Pumping Scheme | |||||||||||
Yerram China Poli Reddy Korisapadu Lift Irrigation Scheme |