Station-wise Energy Plant Load Factor in Telangana (August, 2020) | |||||
Sector/Stations | Monitored Capacity (In MW) | Generation Target (2020-2021) (In GWh) | Plant Load Factor (In %age) | ||
Program | Actual | Actual Same Month (2019-2020) | |||
A. State Sector | |||||
Singareni TPP | |||||
Singareni Collieries Company | |||||
Limited (SCCL) Coal | |||||
Bhadradri TPP | |||||
Kakatiya TPS | |||||
Kothagudem TPS | |||||
Kothagudem TPS (NEW) | |||||
Kothagudem TPS (Stage - 7) | |||||
Ramagundem-B TPS | |||||
Telangana State Power Generation | |||||
Corporation (TSGENCO) Coal | |||||
State Sector Thermal | |||||
Lower Jurala HPS | |||||
Nagarjun SGR HPS | |||||
Nagarjun SGR LBC HPS | |||||
Pochampad HPS | |||||
Priyadarshni Jurala HPS | |||||
Pulichintala HPS | |||||
Srisailam LB HPS | |||||
Telangana State Power Generation | |||||
Corporation (TSGENCO) Hydro | |||||
State Sector Hydro | |||||
B. Central Sector | |||||
Ramagundem STPS | |||||
Telangana STPP | |||||
NTPC Ltd. Coal | |||||
Central Thermal | |||||
Total Thermal | |||||
Total Hydro | |||||
Telangana | |||||
India |