Station-wise Installed Capacity and Actual Generation of Hydro Electric Stations (Installed Capacity Above 25 MW) in Sikkim (2016-2017 to 2019-2020-upto 30.05.2019) | |||||
Station/Utility | Installed Capacity (In Mega Watt) As on 30.05.2019 | Generation (In Million Unit) | |||
2016-2017 | 2017-2018 | 2018-2019 | 2019-2020 (upto 30.05.2019) | ||
National Hydroelectric Power Corporation (NHPC) | |||||
Rangit | |||||
Teesta-V | |||||
Total | |||||
Teesta Urja Ltd. (TUL) | |||||
Teesta III | |||||
Total | |||||
DANS Energy Pvt. Ltd. (DEPL) | |||||
Jorethang Loop | |||||
Shiga Energy Pvt. Ltd. (SEPL) | |||||
Tashiding | |||||
Gati Infrastructure Pvt. Ltd. (GIPL) | |||||
Chuzachen HEP | |||||
Sneha Kinetic | |||||
Dikchu | |||||
Total Sikkim | |||||
India |