Performance of Guru Gobind Singh Super Thermal Plant of Ropar in Punjab (1998-1999 to 2002-2003) | ||||||
Thermal Plant | 1998-99 | 1999-2000 | 2000-01 | 2001-02 | 2002-03 | |
Fixed Target | Achieved | |||||
Generation (M.U.) | ||||||
P.L.F.(%) | ||||||
Coal Consumption Kg./KWH | ||||||
Oil Consumption ML/KWH | ||||||
Auxiliary Consumption (%) | ||||||
Make Up Water Consumption (%) |