Length and Cost of Ongoing National Highway Projects in Odisha (As on 13.06.2014 to 03.03.2024) | |||||
Projects | Length in Km. | Sanction Cost (Rs. in Crore) | Appointed Date | Schedule Completion Date | Target Date of Completion |
4-Laning of Angul- Sambalpur Section of NH-42 (EPC) | |||||
4-Laning of Teleibani – Sambalpur Section of NH-6 (EPC) | |||||
4-Laning of Cuttack –Angul Section of NH-42 (EPC), Package – I | |||||
4-Laning of Cuttack –Angul Section of NH-42 (EPC), Pacakage– II | |||||
4-Laning of Rimuli-Koida Section of NH-215 (New NH 520 (EPC) | |||||
4-Laning of Koida – Rajamunda Section of NH-215 (New NH 520) (EPC) | |||||
4-Laning of Biramitrapur- Brahmani Bridge end Section of NH-23 (EPC) | |||||
6-Laning of Chandikhole- Bhadrak Section of NH-5 (New NH 16) (HAM) | |||||
6-Laning of Puintola to Tangi Section of NH-5 (New NH 16) (EPC) | |||||
4-Laning of Rajamunda to Barkote Section of NH-23 (EPC) | |||||
4-Laning of Brahmani bridge end to Rajamunda Section of NH-23 (EPC) | |||||
4-Laning of Talcher – Kamakhyanagar Section of NH-200/23 (New NH 53) (EPC) | |||||
6-Laning of Tangi- Bhubaneswar Section of NH-5 (New NH 16) (EPC) | |||||
6-Laning of Bhadrak- Balasore Section of NH-5 (New NH 16) (HAM) | |||||
4-Laning of Duburi Chandikhole Section of NH-200 | |||||
3-VUPs at Balikuda, Sikharpur & Badachana in Bhubaneswar-Chandikhole Section of NH-16 | |||||
Flyover at Hanspal of Chandikhole-Jagatpur- Bhubaneswar Section of NH-5 | |||||
Construction of VUPs at Km.11.330 (Kalabadia Chowk) and at Km.14.280 (Kuliana Village) in Balasore-Baripada- Jharpokharia Section of NH-5 | |||||
Balance work of 4-Laning of Panikoili-Rimuli Section of NH-20 | |||||
6L Major Bridge including Approaches from Km.172.895 to Km. 173.670 of NH-520 | |||||
6L of Dhanara - Hatibena Section from Km 124.611 to km 146.50 of NH-130- CD (Package – OD-1) | |||||
Widening and Strengthening to 2L+PS from km 162/700 to km 192/450 (Amalabata to Tandikana) of NH-326 | |||||
Widening to 2L+PS from km 0/00 to km 81/00 & km 93/00 to km 119/00 (Charichhak to Bhanjanagar) of NH-157 | |||||
Widening to 2L+PS from km 50/0 to km 140/9 (Sonepur to Madhapur) of NH-57 | |||||
Widening to 2L+PS from km 239/900 to 294/300 (Nayagarh to Khurda) of NH-57 | |||||
Widening & Strengthening to 2L+PS from km 58/000 to 116/100 (Naktideul to Boudh) of NH 153-B | |||||
Widening to 2L+PS from Km 0/000 to 41/055 (Chandili- Borigumma) of NH 63 | |||||
Widening to 2L+PS from Km 173/370 to 229/400 (Baliguda to Daringbadi) of NH-59 | |||||
Widening to 2L+PS from Km 269/300 to 328/200 (Jharsuguda to Bhojpur) of NH-49 | |||||
Widening to 2L+PS from km 319/280 to 345/480 (Boriguma - Jeypore) of NH-26 | |||||
Widening to 2L+PS from km 0/000 to 35/840 (Tiring to Rairangpur Section) of NH-220 | |||||
Widening to 2L+PS from km 195/600 to 218/050 (Odisha-Chhatishgarh Border to Baldhiamal Chhak) of NH-130C | |||||
Widening to 2L+PS from Km 294/280 to 319/280 (Nabarangpur to Borigumma) of NH-26 | |||||
Widening to 2L+PS from km 296/500 to 336/500 (Mundamarai to Ratanpur Section) of NH-59 | |||||
Construction of Road from km 0/0 to 72/0 of NH-26 such as 4 lane from km 0/0 to 21/0 (Bargarh to Barpali) and 2L+PS from km 21/0 to72/0 (Barpali to Bolangir) | |||||
Strengthening to NH-26 from km 351/480 to 367/480 & from km 376/480 to 434/767 (Koraput to Sunki Ghat) | |||||
Strengthening to NH-326A from km 70/0 to km 102/90 | |||||
Strengthening to NH-326 from km 311/700 to 327/700 | |||||
Strengthening to NH-20 from km 0/0 to 14/0 (Champua-Rimuli) & Link Road to NH-20 from 14/0 to 14/69 (at Parsala) and Connecting road from Rimuli Square at km 14/0 to 1/430 of NH-520 | |||||
Strengthening to NH-326 from km 413/700 to km 429/700 | |||||
Strengthening to NH-326A from km 0/0 to 35/0 in the State of Odisha on EPC Basis. | |||||
Strengthening of Road from Km 174/570 to 186/094 Km, 210/570 to 234/751 & Km 235/ 748 to 243/648 km of NH-20” in the State of Odisha on EPC basis | |||||
Strengthening of Existing Carriageway from km 277/461 to 280/249 Km, 281/ 400 to 286/725 Km, 287/883 Km to 289/454km, 304/720 km to 341/741 km & Km 346/ 000 to 360/391 km of NH-55” in the State of Odisha on EPC basis | |||||
Construction of Truck Parking at Bijakhaman of Bolangir Town from km 79/700 to 80/00 Adjacent to NH-26 in the State of Odisha. | |||||
Removal of Black Spot "Haladia Chhaka Areda" of NH-316 from km 12/900 to 13/400 and Black Spot "Nuanai Chhak" by Improving Road Safety through Improvement of Junction and Implementing Permanent Measures etc. | |||||
Reconstruction of Proposed High Level Bridge over Pochaka Nallah at km 17/950 of NH-326 (Single Span of 18.00 m RCC T- Beam & Slab Bridge with Footpath) in the State of Odisha. | |||||
Rehabilitation of Tel Bridge between 126/690 to 127/163 of NH-26 such as Providing Mastic Asphalt, BC, Crash Barriers for the year 2019-20 in the State of Odisha | |||||
Re-construction of HL Bridge over Kantyali Nallah at 47/200 km of NH-153B for the year 2020-21 in the State of Odisha. | |||||
Rehabilitation and Upgrading to 2 Lanes/2 Lane with Paved Shoulder from Km 90/0 to 158/0 (Nuapada to Bangomunda) of NH-217 under Phase-I of NHIIP. | |||||