Station-wise Energy Plant Load Factor in Meghalaya (August, 2018) | |||||
State/Stations | Monitored Capacity (In MW) | Target (April 2018 to March 2019) | Plant Load Factor (In %age) | ||
Program | Actual | Actual Same Month (2017-2018) | |||
State Sector | |||||
Kyrdemkulai HPS | |||||
Myntdu (Leshka) St-1 HPS | |||||
New Umtru HPS | |||||
Umiam HPS St-I | |||||
Umiam HPS St-Iv | |||||
Meghalaya Energy Corporation Limited (MeECL) Hydro | |||||
State Hydro | |||||
Central Sector | |||||
Khondong HPS | |||||
NEEPCO Hydro | |||||
Central Hydro | |||||
Total Hydro | |||||
Meghalaya | |||||
India |