Growth of Power System in Kerala (1992 & 1997, 2000 to 2002) | |||||
Particulars | Position As on | ||||
31.3.1992 | 31.3.1997 | 31.03.2000 | 31.3.2001 | 31.3.2002 | |
Installed Capacity-MW | |||||
Maximum Demand (System)-MW | |||||
Generation Per Annum-M.U. | |||||
Import Per Annum-M.U. | |||||
Export Per Annum-M.U | |||||
Energy Sales Per Annum-M.U. | |||||
Energy Losses of Percentage of Energy Available for Sales | |||||
Per Capita Consumption -Kwh | |||||
220 K.V. Lines-CT Km | |||||
110 KV. Lines-CT Km | |||||
66KV Lines-CT Km | |||||
11 KV Lines-CT Km | |||||
L.T. Lines-CT Km | |||||
Step up Transformer Capacity-MVA | |||||
No. of EHT Sub Stations | |||||
Step down Transformer Capacity-MVA | |||||
Distribution Transformers | |||||
a) Numbers | |||||
b) Capacity-MVA | |||||
No. of Villages Electrified | |||||
No. of Consumers (in Lakhs) | |||||
Connected Load-M.W. | |||||
No. of Street Lights | |||||
No. of Irrigation Pumps | |||||
Total Revenue Per Annum (Rs. in Lakh) |