Sector/Station-wise Energy Plant Load Factor in Delhi (2023-2024) | ||||||
(In Gigawatt Hours) | ||||||
UT | Sectors/Stations | Monitored Capacity (In Megawatt) | Generation Target (2023-2024) | Plant Load Factor (In %age) | ||
Program | Actual | Actual Same Period (2022-2023) | ||||
Delhi | ||||||
India |