Central Assistance Released for Various Schemes under Flood Management Programme (FMP) in Assam (2017-2018 and 2018-2019) | ||
(Rs. in Crore) | ||
Scheme Name | 2017-2018 | 2018-2019 |
Protection of Makadhuj Area From the Erosion of River Brahmaputra (Construction of Land Spur at Ch. 9560 M) | ||
Anti-Erosion Measures for `Extension of Tengakhat Bund Up to Jokai Reserve Forest" at Dehinghulla (Chainage 4000 M), Telpani Reserve forest (Chainage 8800 M), Bhurbhuri (Chainage 15800 M) and Bhurbhuri (Chainage 18500 M ) | ||
Raising and Strangthening of Flood Embankment Along Right Bank of River Barnadi From Halda to Its Outfall at Lenga at Different Reaches including Anti-Erosion Measures. | ||
Anti-Erosion Measures to Protrct Soalkuch town From the Erosion of River Brahmaputra Ph-V. | ||
Anti-Erosion Measures to Protect Left Bank Embankment of River Burhi-Dehing at Namfakial Village. | ||
R/S to Bramahaputra Dyke From Palasbari to Gumi Fron Ch. 0 Km to 21.2 Km including Anti-Erosion Measures at Different Reaches. | ||
Anti-Erosion Measures to Protect Dirakmukh Area on the Left Banks of Non-Dehing River at Saikhowa Protection Bund Ph-1 | ||
Raising and Strengthening to Dehing Bund Right Bank From Kotoha to Sessamukh | ||
Raising and Strengthening to Flood Protection Bund of Tengakhatmouza including Anti-Erosion Measures at 3 Rd Km (Bantana) Abd 12 Th Km (Tikirabali) | ||
Protction of Brhmaputra Dyke From Sissikalghar to Tekeliphuta at Different Reaches From Lotasur to Tekeliphuta From the Erosion of River Brahmaputra (Review) | ||
R/S of B/Dyke on L/B From Gumi to Kalatoli From Ch. 21.30 Km to 27.80 Km including Recoupment of the Dyke From Ch. 27.80 Km to Ch. 35.00 Km. | ||
Anti-Erosion Measures at Different Reaches of River Dhansiri on Its Banks. | ||
Anti-Erosion Measures at Different Reaches of Dhansiri and Its Subtributaries (Rewta and Rowtamukh River). | ||
Anti-Erosion Measures in Both Banks of River Mangaldal to Protect Mangaldal town and Adjoining Villages | ||
Protection of Tezpur University and Its Adjoing Area From Erosion of River Jiabharli | ||
R/S of Barnadi L/B Embankment From Patgirlsuba to Rk Embankment | ||
Flood Management of River Ranganadi Along With River Training Works on Both Bank Embankments in Lakhimpur State, Assam. | ||
Providing Revetment and R/S to M/E Along Both Banks of River Durpang From Near Rajgarhali to Its Outfall at Pichala | ||
Anti-Erosion Measures to Protect Moisa and Belguri Village From the Erosion of River Gangadhar. | ||
Anti-Erosion Measures to Protect Bhalukmari and Its Adjoing Areas From the Erosion of River Brahmaputra. | ||
Channelisation of Gangadhar River in Between Chilaraj Bridge and Railway Bridge to Protect Pub-Kanori Ratiadah and Golakganj town From the Erosion of River Gangadhar. | ||
Flood Management of River Dikrong Along With River Training Works on Both Banks Embankment in the Lakhimpur State, Assam. | ||
Protection of Biswanatha -Panpur including Areas of Upstream Silamari and Far Downstream Bhumuragauri to Borgaon Against Erosion of River Brahmaputra | ||
Total |