Item-wise Average Cost of Construction in Rural and Urban Sectors of Andhra Pradesh (2005-2006) | ||
(in Rupees) | ||
Item | Total Cost | |
Rural (Both Residential & Institutional) (Plinth Area 941.12 Sft) | Urba (Both Residential & Institutional (Plinth Area 1034.16 Sft) | |
A. Material Used | ||
1-a. Claly Bricks | ||
b. Cement Bricks | ||
c. Cement Hollow Bricks | ||
d. Other Bricks | ||
2-a. Sand -Fine | ||
b. Sand-Medium | ||
c. Sand-Coarse | ||
3-a. Stone Ballast-12/15 MM | ||
b. 20 MM | ||
c. 40 MM | ||
d. Granite Stones | ||
4-a. Ordinary Cement | ||
b. White Cement | ||
c. Teak | ||
6-a. Salwood | ||
b. Other Wood Specify | ||
c. M.S. Round Bars- 8 MM | ||
d. 10 MM | ||
e. 12 MM | ||
d. 16 MM | ||
e. 6 MM | ||
f. M.S. Angular Iron 1 | ||
e. 2 | ||
f. M.S. Flat Iron 1 | ||
g. 2 | ||
h. Other Steel | ||
7-a. Polished Stones | ||
b. Rough Stones | ||
c. Marble Stones | ||
d. Ceremic Tiles | ||
e. Others | ||
8-a. Mangolore Tiles | ||
b. Local Tiles | ||
c. Glazed Tiles 1 | ||
d. 2 | ||
9-a. SW Pipes- 100 MM | ||
b. SW Pipes-150 MM | ||
c. AC Pipes-100 MM | ||
d. AC Pipes-150 MM | ||
e. Pvc Pipes 110 MM | ||
f. 2 | ||
g. Sinks Used for Toilets | ||
h. Sinks Used for Handwash | ||
I. Other - Sanitary | ||
10-a. Lime for White Wash | ||
b. Wall Paints | ||
c. Varnish | ||
d. Colour Paints | ||
e. Other Paints (Varnish Paints) | ||
f. Other - Paints | ||
11-a. Wires (Interior) | ||
b. Service Wire | ||
c. Other Wires | ||
d. Switch Boards | ||
e. Switches & Plug Points | ||
f. Main Switch | ||
g. Fuses | ||
h. Plastic Pipes for Wiring | ||
i. Bolts and Nuts | ||
j. Other | ||
12-a. G.A Pipes | ||
b. Plastic Pipes | ||
c. Taps | ||
d. Other - Water Pipes | ||
13-a. Asbestos Cement Sheets | ||
b. Flush Doors | ||
c. Window Frames-wood | ||
d. Window Frames-Steel | ||
e. Door Frames - Wood | ||
f. Door Frames - Steel | ||
g. Sheet Glass | ||
h. Ventilators- Steel | ||
i. Ventilators- Wood | ||
j. Ventilators- Cement | ||
k. Boltd and Nuts (Used for Window & Doors) | ||
l. Other (Specify) 1 | ||
m. 2 | ||
n. 3 | ||
Material Total | ||
B. Labour Charges | ||
1-a. Skilled - Mason | ||
b. Carpenter | ||
c. Electrian | ||
d. Plumber | ||
e. Other Skilled Labour | ||
2-a. Un-Skilled-Man | ||
b. Women | ||
3. Centring Charges | ||
4. Other Labour | ||
Labour Total | ||
C. Miscellaneous | ||
1. Water Con. Charges | ||
2. Electricity Con. Charges | ||
3. Drainage Connection Charges | ||
4. Material Mixing Charges | ||
5. Supervisory Charges | ||
6. Curing Charges | ||
7. Engineering Charges | ||
8. Plan Approval Charges | ||
9. Transport Charges | ||
10. Rents Paid Towards Con. Equip. | ||
11. Other Mis. Charges | ||
Miscellaneous Total | ||
D. Total Cost of Construction (A+B+C) | ||
Material | ||
Labour | ||
Miscellaneous |