Tentative Transmission Projects by Power Grid in India (2002-2007 and 2007-2012) | |||
(Investment Rs. in Crore) | |||
Transmission Schemes | Phase I (for completion in 10th plan | Phase II (for completion in 11th plan | Total |
Tala Transmission System East-North interconnection & Northern Region Strengthening | |||
Supplementary Scheme for Tala Transmission system | |||
Bina-Nagda & Nagda-Dehgam line Portion Proposed under IPTC Route | |||
Composite Transmission System for Barh, Kahalgaon II and North Karanpura | |||
Tansmission Syetem for Bulk Power Evacuation from Sipat-I & II | |||
Investment in on going Transmission Systems of 10th Plan | |||
Regional System strengthening schemes of NR/WR/SR/ER & NER during the 10th plan | |||
ER-NR/WR/SR National Link Scheme for Enabling Utilization of Operation Surplus on all Indian Basis | |||
Gazuwaka-II Transmission System for Enhancing Export of ER Surplus to SR | |||
10 th Plan Generation linked Transmission System and Advance Action 11th Plan | |||
Transmission System for Rihand-II | |||
ER-NR HVDC bipole link and 765 kv lines of Hirma | |||
Pooling Station NER-DE Pooling Station NR/WR HVDC bipole I & II | |||
NER Hydro Projects Evacuation and System Strengthening in NER | |||
Inter-Regional Transmission Strengthening During the 11th plan | |||
Advance action for Capacity Addition during the 12th plan | |||
Generation Linked Transmission Projects during 11th Plan and Spill-over from 10th Plan | |||
Total |