Selected State-wise Capacity Sanctioned and Installed of Grid Connected Solar Power Plants under Various Component of Pradhan Mantri Kisan Urja Suraksha Evam Utthaan Mahabhiyan (PM-KUSUM) Scheme in India (As on 30.06.2023) | |||||||
States/UTs | Component-A (In MW) | Component-B (In Nos.) | Component-C (In Nos.) | ||||
Sanctioned | Installed | Sanctioned | Installed | Sanctioned (IPS) | Sanctioned (FLS) | Installed | |
Arunachal Pradesh | |||||||
Assam | |||||||
Chhattisgarh | |||||||
Bihar | |||||||
Gujarat | |||||||
Goa | |||||||
Haryana | |||||||
Himachal Pradesh | |||||||
Jammu & Kashmir | |||||||
Jharkhand | |||||||
Karnataka | |||||||
Kerala | |||||||
Ladakh | |||||||
Madhya Pradesh | |||||||
Maharashtra | |||||||
Manipur | |||||||
Meghalaya | |||||||
Mizoram | |||||||
Nagaland | |||||||
Odisha | |||||||
Puducherry | |||||||
Punjab | |||||||
Rajasthan | |||||||
Tamil Nadu | |||||||
Telangana | |||||||
Tripura | |||||||
Uttar Pradesh | |||||||
Uttarakhand | |||||||
West Bengal | |||||||
India |