Scheme-wise Installed Capacity, Capacity Under Renovation and Modernization and Life Extension and Restoration Estimated Cost of Hydro Power Stations in India (2018-2019) | ||||
Scheme | Installed Capacity (No. x MW) | Capacity under R and M (In MW) | Cost (Rs. In Crore) | Agency |
Ganderbal | ||||
Chenani | ||||
Rihand | ||||
Nagarjuna Sagar Ph-II Works | ||||
Nagarjuna Sagar Left Canal Power House | ||||
Bhadra River Bed Units | ||||
Sholayar | ||||
Sholayar-I | ||||
Gandhi Sagar | ||||
Hirakud-II (Chilima) |