Region-wise Power Transmission Capacity of Inter Regional Links Existing in India (As on 31.03.2012) | |||
Region/Inter-Regional Transmission | At the end of 10th Plan | Add. During 11th Plan | At the end of 11th Plan (As on 31.03.2012) |
ER-SR | |||
Gazuwaka HVDC back to back | |||
Balimela-Upper Sileru 220kV S/C | |||
Talcher-Kolar HVDC Bipole | |||
Upgradation of Talcher-Kolar HVDC bipole | |||
ER-SR Total | |||
ER-NR | |||
Muzaffarpur - Gorakhpur 400kV D/C (Quad Moose) with TCSC | |||
Dehri-Sahupuri 220kV S/C | |||
Patna-Balia 400kV D/C quad | |||
Biharshariff-Balia 400kV D/C quad | |||
Barh-Balia 400kV D/C quad # | |||
Sasaram-Fatehpur 765kV S/C line-1 ## | |||
Gayaâ?"Balia 765kV S/C ### | |||
Sasaram | |||
(i) HVDC back to back | |||
(ii) Bypassing of HVDC back-to- back to establish Sasaram-Allahabad/Varanasi 400kV D/C line | |||
ER-NR Total | |||
ER-WR | |||
Rourkela-Raipur 400kV D/C | |||
TCSC on Rourkela-Raipur 400kV D/C | |||
Budhipara-Korba 220kV D/C+S/C | |||
Ranchi-Sipat 400kV D/C (40% SC) | |||
Ranchi-Rourkela-Raipur 400kV D/C with fixed series capacitor, TCSC in parallel line | |||
ER-WR Total | |||
ER-NER | |||
Birpara-Salakati 220kV D/C | |||
Malda-Bongaigaon 400kV D/C | |||
ER-NER Total | |||
NR-WR | |||
Vindhychal HVDC back to back | |||
Auria-Malanpur 220kV D/C | |||
Kota-Ujjain 220kV D/C | |||
Agra-Gwalior 765kV S/C line-1 400kV op. | |||
Agra-Gwalior 765kV S/C line-2 400kV op. | |||
Kankroli-Zerda 400kV D/C | |||
NR-WR Total | |||
WR-SR | |||
Chandrapur HVDC back to back | |||
Barsurâ?"L.Sileru 200kV HVDC mono pole @ | |||
Kolhapur-Belgaum 220kV D/C | |||
Ponda - Nagajhari 220kV D/C | |||
WR-SR Total | |||
Total ALL India (200kv & Above), in MW | |||
132kV/110kV Inter-Regional links 4xD/C + 4XS/C = 12 ckts $ | |||
Total All India (110/132kV & above), (In MW) |