Existing/Proposed Inter-Regional Power Transfer Capacity (By the End of XI Plan i.e. 2012) in India (As on 31.03.2007, 28.02.2010 and 30.03.2012)-(As on Nov.2012) | |||||||
System | At the End of 10th Plan i.e. 31.03.2007 | Additions During 11th Plan Upto 28.02.2010 | Existing (As on 28.02.2010) | Balance Program for 11th Plan | Exiting (Nov` 11) | At the End of 11th Plan i.e. 31.03.2012 | Existing (As on November, 2012) |
ER-SR | |||||||
Gazuwaka HVDC Back to Back | |||||||
Balimela-Upper Sileru 220kV S/C | |||||||
Telcher-Kolar HVDC Bipole | |||||||
Upgradation of Talcher-Kolar HVDC Bipole | |||||||
ER-SR Total | |||||||
ER-NR | |||||||
Muzaffarpur-Gorakhpur 4000kV D/C (Quad Moose) with TCSC | |||||||
Dehri-Sahupuri 220kV S/C | |||||||
Patna-Balia 400kV D/C Quad | |||||||
Biharshriff-Balia 440kV D/C Quad | |||||||
Barh-Balia 400kV D/C Quad | |||||||
Sasaram-Fatehpur 765kV S/C line-1 | |||||||
Gaya-Balia 765kV S/C | |||||||
Sasaram :- | |||||||
HVDC Back to Back | |||||||
Bypassing of HVDc Back to Back to Establish Sasaram-allahabad/Varanasi 400kV D/C Line | |||||||
ER-NR Total | |||||||
ER-WR | |||||||
Rourkela-Raipur 400kV D/C | |||||||
TCSC on Rourkela-Raipur 400kV D/C | |||||||
Budhipara-korba 220kV D/C+S/C | |||||||
Ranchi-Sipat 400kV D/C (40%SC) | |||||||
Ranchi-Rourkela-Raipur 400kV D/C with Fixed Series Capacitor, TCSC in Parallel Line | |||||||
Ranchi-Sipat pooling Point 765kV S/C | |||||||
ER-WR Total | |||||||
ER-NER | |||||||
Birpara-Salakati 220kV D/C | |||||||
Malda-Boagaigaon 400kV D/C | |||||||
Bongaigaon-Siliguri 400kV D/C Quad** | |||||||
ER-NER Total | |||||||
NR-WR | |||||||
Vidhychal HVDC Back to Back | |||||||
Auria-Malanpur 220kV D/C | |||||||
Kota-Ujjain 220kv D/C | |||||||
Agra-Gwalior 765kV S/C Line-2 400kV op. | |||||||
Agra-Gwalior 765kV S/C Line-1 400kV op. | |||||||
Kankroli-Zerda 400kV D/C | |||||||
NR-WR Total | |||||||
WR-SR | |||||||
Chandrapur HVDC Back to Back | |||||||
Barsur-L. Sileru 200kV HVDC Mono Polo@ | |||||||
Kolhapur-Belgaum 220kV D/C | |||||||
Ponda-Nagajhari 220kV D/C | |||||||
Barsur- L. Sileru 220kv HVDC Monopole* | |||||||
Narendra-Kolhapur HVDC Back to Back with Narendra-Kolhapur 400kV D/C Line | |||||||
WR-SR Total | |||||||
NER/ER-NR/WR | |||||||
NER/ER-NR/WR Total | |||||||
Total All India (200kV and Above) | |||||||
132kV/110kv Inter-Regional Links 4XD/C+4XS/C=12 ckts$ | |||||||
Total All India (110/132kV and Above) |