Plan-wise Generation, Purchased and Consumption of Power in Madhya Pradesh (31.03.1951 to 2004-2005) | |||||||||||
Plan Period | Installed Capacity (MW) (At the End of the Plan) | Sustained Peak Demand Reached During Plan Period (MW) @ | Annual Gross Generation (MKWH) @ | Purchase of Power @ (MKWH) | Annual Gross Gene- ration. Purchased (MKWH) @ | Per Capita Consum- ption (KWH) @ | Auxiliary Consum- ption @ (MKWH) | Unit Sold (MKWH) @ | |||
Thermal | Hydel | Total | Inter State | NTPC | |||||||
Pre Plan 31-3-1951 | |||||||||||
1st Plan 1951-56 | |||||||||||
2nd Plan 1956-61 | |||||||||||
3rd Plan 1961-66 | |||||||||||
Annual Plan 1966-69 | |||||||||||
4th Plan 1969-74 | |||||||||||
5th Plan 1974-78 | |||||||||||
Annual Plan 1978-80 | |||||||||||
6th Plan 1980-85 | |||||||||||
7th Plan 1985-90 | |||||||||||
Annual Plan 1990-92 | |||||||||||
8th Plan 1992-97 | |||||||||||
9th Plan 1997-2002 | |||||||||||
1997-1998 | |||||||||||
1998-1999 | |||||||||||
1999-2000 | |||||||||||
2000-2001 | |||||||||||
2001-2002 | |||||||||||
10th Plan 2002-2007 | |||||||||||
2002-2003 | |||||||||||
2003-2004 | |||||||||||
2004-2005 |