Selected State/Station-wise Status of Gas Based Power Projects in India (As on 31.01.2013) | |||
Power Stations | Installed Capacity (In MW) | States | Gas Requirement at 90% PLF (MMSCMD) |
Existing Stations | |||
Faridabad CCPP | |||
Anta CCPP | |||
Auraiya CCPP | |||
Dadri CCPP | |||
Gandhar CCPP | |||
Kawas CCPP | |||
Ratnagiri CCPP | |||
Kathaiguri CCPP | |||
Agartala GT | |||
I.P. CCPP | |||
Pragati CCGT-III | |||
Pragati CCPP | |||
Dholur CCPP | |||
Ramgarh CCPP | |||
Dhuvaran CCPP | |||
Hazira CCPP Ext. | |||
Hazira CCPP Ext. | |||
Utran CCPP | |||
Uran CCPP | |||
Karaikal CCPP | |||
Kovilkalpal CCPP | |||
Kuttaiam CCPP | |||
Valuthur CCPP | |||
Lakwa GT | |||
Namrup CCPP | |||
Namrup ST | |||
Baramura GT | |||
Rokhia GT | |||
Vatwa CCPP | |||
Trombay CCPP | |||
Rithala CCPP | |||
Baroda CCPP | |||
Essar CCPP | |||
Peguhtan CCPP | |||
Sugen CCPP | |||
Gautami CCPP | |||
GMR Energy Ltd | |||
Godavari CCPP | |||
Jegurupadu CCPP | |||
Konaseema CCPP | |||
Kondapalli Ext. CCPP | |||
Kondapalli CCPP | |||
Peddapuram CCPP | |||
Vemagiri CCPP | |||
Vijeswaran CCPP | |||
Karuppur CCPP | |||
P. Nallur CCPP | |||
Valantarvy CCPP | |||
DLF Assam GT | |||
Sriba Industries | |||
RVK Energy | |||
Silk Road Sugar | |||
LVS Power | |||
Total |