State-wise Number of Renewable Energy Projects and Capacity Sanctioned under Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan (PM-KUSUM) Scheme in Hindi Belt of India (As on 28.02.2022) | |||||||
States/UTs | Component-A (MegaWatt) | Component-B (Nos.) | Component-C (Nos.) | ||||
Sanctioned | Installed | Sanctioned | Installed | Sanctioned Individual Pumps Solarization (IPS) | Sanctioned Feeder Level Solarisation (FLS) | Installed | |
Chhattisgarh | |||||||
Delhi | |||||||
Haryana | |||||||
Himachal Pradesh | |||||||
Jharkhand | |||||||
Madhya Pradesh | |||||||
Rajasthan | |||||||
Uttar Pradesh | |||||||
Uttarakhand | |||||||
Hindi Belt | |||||||
India |