State-wise Length of Transmission Lines and Capacity of Substations of Renewable Energy (RE) Power Projects in Hindi Belt of India (As on 06.01.2022) | |||
States/UTs | Length of Transmission Lines (In CKM) | Capacity of Substations (In MVA) | RE Addition Envisaged (In MW) |
Himachal Pradesh | |||
Rajasthan | |||
Uttar Pradesh | |||
Hindi Belt | |||
India |