Generation from Hydro Power Stations in Himachal Pradesh (2001-02 & 2002-03) | |||||||
Station/ Region MU | Installed Capacity (as on 31.3.03 MU) | 2001-02 | 2002-03 | ||||
Programme MU | Achieve- ment MU | % of Achieve- ment Prog. | Programme MU | Achieve- ment MU | % of Achieve- ment Prog. | ||
BBMB | |||||||
Bhakra L & R (HP) | |||||||
Dehar (HP) | |||||||
Pong (HP) | |||||||
Total BBMB | |||||||
NHPC | |||||||
Baira Siul (HP) | |||||||
Chamera Stage-I (HP) | |||||||
Total NHPC | |||||||
Total Central | |||||||
Himachal Pradesh | |||||||
Giri Bata | |||||||
Bassi | |||||||
Binwa | |||||||
Andra | |||||||
Sanjay | |||||||
Gaj | |||||||
Baner | |||||||
Thirot | |||||||
Ghanvi | |||||||
Total HPSEB | |||||||
Malana (Pvt.) | |||||||
Baspa-II (Pvt.) | |||||||
Total Pvt. | |||||||
Grand Total (HP) | |||||||
India |